// Active Diligence — Downtown Orlando

What we're underwriting right now.

Five parcels currently in active diligence across downtown Orlando's core submarkets. This is a live pipeline, not a portfolio — offers are being prepared on several of these now.

Note

Addresses are withheld pending LOI to protect deal terms ahead of offer submission. Full parcel details are available on request for verified counterparties and prospective LPs.

01
Parramore / West Downtown
Target use — Residential (Mixed-Income)

Assemblage site inside the Parramore activity center, walking distance to Camping World Stadium and the broader west-downtown redevelopment corridor.

1.8 acSite Size
AC-3NZoning
150–180Est. Units
LOI Drafted
02
Creative Village Perimeter
Target use — Mixed-Use (Residential + Office)

Perimeter parcel adjacent to the Creative Village innovation district and UCF Downtown campus — direct beneficiary of anchor-tenant foot traffic.

0.9 acSite Size
PDZoning
~120K SFBuildable
Offer Imminent
03
Thornton Park / Lake Eola Fringe
Target use — Boutique Residential

Infill lot two blocks from Lake Eola in one of downtown's highest walk-score districts. Low-density upside with strong comparable absorption.

0.4 acSite Size
R-2B / PDZoning
12–18Est. Units
Reviewing
04
South Downtown / SoDo Corridor
Target use — Hospitality + Ground-Floor Retail

Orange Avenue frontage in the SoDo corridor, positioned for a limited-service hotel anchoring a small mixed-use retail component.

2.6 acSite Size
C-3Zoning
~140 KeysEst. Program
Reviewing
05
Church Street District
Target use — Adaptive Mixed-Use / Hospitality

Historic-district-adjacent parcel near the Amway Center and Dr. Phillips Center, suited to a boutique hospitality anchor with street-level activation.

1.1 acSite Size
C-2 / Downtown OverlayZoning
~80 KeysEst. Program
LOI Drafted

From detection to close

01

Signal Detection

The Sightline Engine flags the market — infrastructure spend, migration, zoning activity, or in Orlando's case, active price distress.

02

Underwriting

Site-level modeling against zoning, comparable absorption, and target program before a parcel enters this list.

03

Diligence

Title, environmental, and entitlement review run in parallel with LOI negotiation to protect timeline.

04

Offer & Close

Formal offer submitted, closing coordinated with Sightline Fund I capital deployment schedule.

Want visibility into the full pipeline?

Investors in Sightline Fund I get parcel-level underwriting detail as diligence progresses.

Learn About Sightline Fund I →